Bid Solicitation: MDBCS31041059
Header Information
Bid Number: MDBCS31041059 Description: IFB-19030 HVAC & Fire Protection System Upgrades at Samuel Coleridge-Taylor ES Bid Opening Date: 11/15/2018 11:00:00 AM
Purchaser: Stuart Feldman Organization: Baltimore City Public Schools
Department: MM - Materials Management Location: MM - Materials Management
Fiscal Year: 19 Type Code: IT - Invitation to Bid (ITB) Allow Electronic Quote: No
Alternate Id:   Required Date: Available Date :  09/27/2018 03:00:00 PM
Info Contact: Contact: Stuart Feldman, Email: safeldman@bcps.k12.md.us Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference: Mandatory walk through project construction site will be on October 11, 2018 at 10:30 a.m. at: Samuel Coleridge-Taylor Elementary School #122
Bulletin Desc: IFB-19030 HVAC & Fire Protection System Upgrades at Samuel Coleridge-Taylor Elementary School #122
Ship-to Address: Baltimore City Public Schools
Materials Management
200 East North Avenue
Room 401
Baltimore, MD 21202
US
Email: donotreply@bcps.k12.md.us
Phone: (410)396-8757
Bill-to Address: Baltimore City Public Schools
Materials Management
200 East North Avenue
Room 401
Baltimore, MD 21202
US
Email: donotreply@bcps.k12.md.us
Phone: (410)396-8757
Print Format:
File Attachments: IFB-19030 HVAC & Fire Protection System Upgrades at Samuel Coleridge-Taylor Elementary School #122
IFB-19030 Addendum #1
Pre-Bid Sign in Sheet
IFB-19030 Addendum #2
City of Baltimore 2018 Prevailing Wage Rates
Revised Specifications-Section 230719-Mechanical Insulation
IFB-19030 Addendum #3
IFB-19030 Addendum #4
Revised Bid Cover Page
Revised Instructions to Bidders Page
Revised Vendor Response to Solicitation Page
Form Attachments:
Amendments:
Amendment # Amendment Date Amendment Note
1 10/19/2018 11:56:34 AM Pre-bid walk through sign in sheet Attachment File Changes: Header 1. File 'IFB-19030 Addendum #1 ': File 'IFB-19030 Addendum #1 ' added . 2. File 'Pre-Bid Sign in Sheet': File 'Pre-Bid Sign in Sheet' added . Enrollment Date Changes:
2 10/26/2018 03:54:59 PM Addendum #2-bid due date extension ans answers to questions. Header 1. Bid Opening Date changed from "11/01/2018 11:00:00 AM" to "11/08/2018 11:00:00 AM". Attachment File Changes: Header 1. File 'IFB-19030 Addendum #2': File 'IFB-19030 Addendum #2' added . 2. File 'City of Baltimore 2018 Prevailing Wage Rates': File 'City of Baltimore 2018 Prevailing Wage Rates' added . 3. File 'Revised Specifications-Section 230719-Mechanical Insulation': File 'Revised Specifications-Section 230719-Mechanical Insulation' added . Enrollment Date Changes:
3 11/01/2018 12:52:43 PM To post Addendum #3. Header 1. Bid Opening Date changed from "11/08/2018 11:00:00 AM" to "11/15/2018 11:00:00 AM". Attachment File Changes: Header 1. File 'IFB-19030 Addendum #3': File 'IFB-19030 Addendum #3' added . Enrollment Date Changes:
4 11/14/2018 12:07:51 PM To add inclement weather language to solicitation documents. Attachment File Changes: Header 1. File 'IFB-19030 Addendum #4': File 'IFB-19030 Addendum #4' added . 2. File 'Revised Bid Cover Page': File 'Revised Bid Cover Page' added . 3. File 'Revised Instructions to Bidders Page': File 'Revised Instructions to Bidders Page' added . 4. File 'Revised Vendor Response to Solicitation Page': File 'Revised Vendor Response to Solicitation Page' added . Enrollment Date Changes:
Item Information
Item # 1:   IFB-19030 HVAC & Fire Protection System Upgrades at Samuel Coleridge-Taylor Elementary School #122
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
This item is narrative
 
Item # 2:   ( 941  -  55 )   ITEM #1 HVAC System Upgrades at Samuel Coleridge-Taylor Elementary School #122
NIGP Code: 941-55
   HVAC Systems Maintenance and Repair, Power Plant
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
1.0   JB - Job        
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 3:   ( 925  -  39 )   ITEM #2 Fire Protection System Upgrade
NIGP Code: 925-39
   Fire Protection Engineering
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
1.0   JB - Job        
Manufacturer: Brand: Model:
Make: Packaging: